
Table of contents
4.3.1 Beckhoff power supply technology 17
4.4 Connecting Power Supply 19
4.4.1 Cable Cross Sections 19
4.4.2 Check voltage rating and connect 19
4.4.3 Configuration for shutting down the PC 19
4.4.4 PC_ON and Power Status functions 19
4.4.5 Wiring diagram 20
4.5 Connecting the Panel PC 21
4.5.1 Connecting cables 21
4.5.2 Earthing measures 21
5 Operating Instructions 22
5.1 Switching the Panel PC on and off 22
5.1.1 Switching on 22
5.1.2 Shutting down and switching off 22
5.1.3 First switching on and driver installation 22
5.2 Operation 22
5.3 Servicing and maintenance 23
5.3.1 Cleaning 23
5.3.2 Maintenance 23
5.3.3 Replacing the battery 23
5.4 Emergency procedures 23
5.5 Shutting down 23
5.5.1 Disposal 23
6 UPS Software Components (optional) 24
6.1 Installation on the PC 24
6.2 Help files 24
7 Troubleshooting 25
8 Assembly dimensions 26
9 Technical Data 27
10 Appendix 28
10.1 Beckhoff Support and Service 28
10.1.1 Beckhoff branches and partner companies 28
10.1.2 Beckhoff company headquarters 28
10.2 Approvals for USA and Canada 29
10.3 FCC Approvals for the United States of America 29
10.4 FCC Approval for Canada 29
2 CP32xx
Komentáře k této Příručce